On April 28, 2009, the Heads of the Central Asia states made a joint statement, highlighting the important role of IFAS in coordinating and addressing the fundamental aspects of cooperation to overcome the Aral Sea Basin crisis and strengthen the collaboration with the UN system institutions and other international organizations. It was decided that EC IFAS jointly with the Interstate Commission for Water Coordination, Interstate Commission for Sustainable Development of the IFAS with participation of national experts and donors to develop a Program of actions for the period 2011-2015 (ASBP-3).
The ASBP-3 was adopted on the basis of a decision of the IFAS Board (December 10, 2010, Almaty). The ASBP-3 included the implementation of about 300 national and regional projects totaling more than 15.0 billion US dollars.
Uzbekistan has consistently made a significant contribution to the IFAS. Thus, according to the Decree of the Cabinet of Ministers of the Republic of Uzbekistan No.255 dated 29.08.2015 (as a contribution to the ASBP-3):
«Comprehensive program to mitigate the consequences of the Aral Sea disaster, restoration and socio-economic development of the Aral Sea region for the period of 2015-2018» is currently implemented.
The program includes 235 projects totaling 1920.8 million US dollars, including – 736.4 million US dollars – Uzbekistan’s contribution from the state budget and 1184.4 million US dollars – loans from international financial agencies. Within this program, the projects are being implemented in the following areas:
• Improvement of the management system and economical use of water resources.
• Implementation of large-scale activities on afforestation of the dried Aral Sea bottom and prevention of desertification of the region.
• Creation of conditions for development, reproduction and conservation of the gene pool in the Aral Sea Region.
• Conservation of biodiversity, restoration of biological resources, protection of flora and fauna.
• Improvement of institutional arrangements.
Our partners in Kazakhstan also work within the framework of the ASBP-3 in a number of areas. Thus, in 2016, the President of Kazakhstan approved the «Roadmap for the development of industries in the Aral region for 2017-2019». It included 84 projects worth 114 billion tenge. Of these, 39 projects worth 11.4 billion tenge were implemented in 2017. In 2018, the implementation of projects amounted to 29.4 billion tenge. The construction of a soda ash plant continues. Half of all investments came in rural areas and was aimed at the development of industry, transport, education and health.
In 2017, 541 thousand tons of salt were produced, 206.4 thousand tons of iodized salt, 2.9 thousand tons of fish, 163 tons of meat, 644 tons of bread and bakery products, as well as 135.4 thousand tons of quartz sand were produced.
The second direction in Kazakhstan is the implementation of the project “Regulation of the Syrdarya River Channel and the Northern Aral Sea” (PRRSAM-2).
In 2018, the implementation of the second phase of the project was launched. The development of the second phase of the PRRSAM was supported by the World Bank, which, together with the Government of Kazakhstan, allocated funds for preparatory work on the project. After a thorough analysis of the state of the main waterway of the region – the Syr Darya, water protection facilities, the ecological situation of the region, eight components of PRRSAM-2 were proposed.
This is the restoration of the left-bank lock-regulator of the Kyzylorda hydroelectric complex, the straightening of the Syrdarya river channel in two sections, the construction of protective dams in two regions of the region, one road bridge, the restoration of the Kamyshlybash and Akshatau lake systems in the Aral region. Next, according to the plan, reconstruction and expansion of outgrowth ponds in the Tastak section of the Kamyshlybash hatchery and continuation of the reconstruction of the northern Aral Sea are continued. It is also planned to create a working center for water resources management in the Kazakhstani part of the Syr Darya river basin.
At the first stage, four components will be implemented for 9.5 billion tenge from the republican budget. These are the most significant areas of work for the population, since they are related to ensuring the safety of citizens during the flood period. For example, the straightening of the Syrdarya river bed in the Korgansha and Turumbet sections, the construction of protective dams in the Kazalinsky and Karmakshy districts, and a road bridge near the village of Birlik.
World Bank specialists will visit the region, and carry out site investigations the need for implementation of other components of PRRSAM-2, and perhaps Kazakhstan will receive support from this international financial institution already in the framework of the new ASBP-4.
The third area is the contribution of the Republic of Kazakhstan to IFAS – through the implementation of the portfolio of projects of the Executive Directorate of IFAS in the Republic of Kazakhstan. The total project portfolio – a total of 32 projects – about 100 million US dollars.
Unfortunately, to this day there is no in-depth analysis of the results of the three programs (ASBPs) under IFAS. However, we can safely say that over the past 25 years, the provisions of the «Concept for Solving the Aral Sea Problems» of 1993 have practically become obsolete. Much has been done by countries to mitigate the consequences of the Aral Sea disaster, the socio-economic conditions in the countries of the region have changed, and the water management situation in the region has radically changed. In the Aral basin, like nowhere else in the world, the effects of climate change are being observed.
Many other factors also indicate that the time has come to change practices regarding building ecosystem resilience with economic growth.